Steel Construction Summer House

  • Total Area : Floor : 2
  • Bedroom : Bathroom : 2
  • Living Room : 1 Dining Room : 1
  • Garage : 1 Friendly places

Description:

Our construction workers use within just a few days in our office to build a lightweight steel constructions. Ground light steel villa needs a flat piece of concrete, the tile of our office on flat enough, eliminating the foundations of the process. First bottom frame assembly inside the pavilion, covered with Oriented Strandboard , to make it smooth, then surrounded by the mounting frame, and finally build a triangle top shelf, make sharp styling top sub. 

initpintu_副本

Factory prefabrication and on-side assembly greatly shortens construction period. Dry operation is adopted and can be done in the Northern Areas in winter. The installation site is environmentally friendly with no dust pollution or sewage pollution. For example, it only takes 5~7 days to complete the main structure installation of a 200m2 detached house and two months to complete refined indoor and outdoor decoration.

Share:
Fill out my online form.